Home About Us News Products Service network Case show Feedback Contact  
  PRODUCT CATEGORIES
    Ship power system
     Medium/low voltage main switchboard
     The emergency switchboard
     The switchboard
     shore connection box
     Electric box
     Startup box/Emergency cut-off box
     test panel
    Ship automation system
     Marine power station management system
     Engine room monitoring and alarming system
     Liquid level telemetry system
     Valve remote control system
     DP power positioning system
     The bridge watch alarm system
     Ship shore information integration system
     Electric propulsion system
    Ship steering control station
     Driving console
     Engine room set control station
     Damage control station
     The two wings console
     Cargo console /General guide / chart table
    Other
     Sea water pump energy saving
     Medium voltage shore power
     Active power filter
     Marine LCDS
     Digital electric potentiometer
     The light signal controller
 
 
News
Zhejiang Xinya magneto Electricity Development Co., Ltd., recently winning Jiangnan Shipyard 3 million cubic meters of liquefied natural gas (LNG) regional transport ship ship distribution system project.
It is reported, the ship was the first domestic small LNG regional transport ship, but also the world space ship LNG C largest cabin. This type of ships for a total of 185.5 m, the cabin design capacity of 3 million cubic meters, the four independent C type hold main propulsion system of the dual fuel generator + rudder and propeller propulsion (DFDE) "by way, emissions targets far below the requirements of the relevant international standards. In view of the matching technology of the ship demanding requirements, Xinya company with their years of successful design supporting large, high technical requirements form the rich experience, carefully prepared, in the tender in the ships of the original design scheme put forward suggestions for improvement of equipment configuration, power allocation scheme of the system, of the operation of a number of construction of, plenty of communication and the shipyard, won the praise.
The project is Zhejiang Xinya magneto Electricity Development Co., Ltd. since the plant for the first time received 30000 cubic LNG ship orders, marking our has satisfied all civilian ship technical requirements and supply capacity, in the domestic counterparts in the set belongs to the "Xinya" banner.
Add£ºNO2. Xin Yuan Road Yu Long Village Zhujiajian street ,Putuo District, Zhoushan City Zhejiang Province, China. TEL£º086-0580-3091119
CopyRight@2016 Zhejiang XINYA Electric Co.,Ltd. All rights reserved